Retrofit Marshalling Yard Senftenberg with New Control Technology

Thanks to AIS Automation Dresden GmbH as general contractor of DB Netz AG, on 06 September 2017 the control system retrofit for the marshalling yard Senftenberg was successfully completed by the aid of the new rail brakes control VarGBS. Within only two months of commissioning under “rolling wheel“, the old control technology for two retarders and 19 secondary retarders have been replaced by the new control system generation VarGBS.

Plattforms: Real-time operating system Linux, VAC, Windows Server 2012 R2, Windows 10 IoT LTSB
Service: Planning, construction management, electrical installations, hardware and software supply, approval in accordance with EN50128 (SIL2), test operation, commissioning